Sunlight & structural assessment
Technical vendor evaluation
DISCOM sanction approval
Installation & grid commissioning
Comparing quotations from vetted local installation partners with verified component specifications and warranties.
Submitting net-metering applications and grid connectivity documentation to local electricity distribution companies.
Evaluating rooftop shade coverage, structural load capacity, and current electrical sanction load before submitting feeder paperwork.
Mounting photovoltaic modules, wiring protective inverters, and completing net meter synchronization for active power generation.
Three essential property checks
Verify these key technical criteria before placing component deposits or signing installation agreements.
Roof load capacity
Unshaded solar hours
Sanctioned meter capacity
Reinforced concrete terraces or sturdy tin sheds must safely support solar module mounting structures against high wind loads.
Rooftops require at least five hours of unobstructed southern sunlight daily, clear of adjacent water tanks or tree shadows.
Your existing DISCOM connection limit determines the maximum kilowatt capacity eligible for net-metered grid connection.
Project completion milestones
3-5 days
Initial roof survey turnaround
15-30 days
DISCOM sanction review window
100%
Independent verification of quotes
Receive our independent roof assessment guide and connect with verified local solar partners across India.